Multi Year Tariff Petition from FY 2025-26 to FY 2027-28.
Public Notice regarding Multi Year Tariff Petition from FY 2025-26 to FY 2027-28 English.
Public Notice regarding Multi Year Tariff Petition from FY 2025-26 to FY 2027-28 Hindi.
Business Plan Petition for the FY 2025-26 to FY 2027-28.
Public Notice regarding Business Plan Petition for the FY 2025-26 to FY 2027-28 Hindi.
Public Notice regarding Business Plan Petition for the FY 2025-26 to FY 2027-28 English.
Regarding rate schedule of Fuel and Power Purchase Cost Adjustment (FPPCA) for the period from 01-12-2024 to 31-12-2024.
Regarding rate schedule of Fuel and Power Purchase Cost Adjustment (FPPCA) for the period from 01-11-2024 to 30-11-2024.
Regarding rate schedule of Fuel and Power Purchase Cost Adjustment (FPPCA) for the period from 01-10-2024 to 31-10-2024.
मा0 मुख्यमंत्री जी द्वारा दिनांक 16 सितम्बर, 2024 को की गई घोषणा के क्रम में उत्तराखण्ड शासन के आदेश सं0 630/I(2)/2024-06(3)-23/2024, दिनांक 24.09.2024 के अनुपालन में उत्तराखण्ड राज्य के विद्युत उपभोक्ताओं को लागू विद्युत दरों में सब्सिडी प्रदान करने के सम्बन्ध में।
Regarding rate schedule of Fuel and Power Purchase Cost Adjustment (FPPCA) for the period from 01-09-2024 to 30-09-2024.
Regarding rate schedule of Fuel and Power Purchase Cost Adjustment (FPPCA) for the period from 01-08-2024 to 31-08-2024.
PUBLIC NOTICE: Regarding Public Hearing to decide on admissibility of the Petition for review of the Commission’s Tariff Order dated 28.03.2024 on the Annual Revenue Requirement & Tariff Petition for FY 2024-25 filed by Uttarakhand Power Corporation Limited (UPCL) before the Uttarakhand Electricity Regulatory Commission.
सार्वजनिक सूचनाः यूपीसीएल की वर्ष 2024-25 की वार्षिक राजस्व आवश्यकता एवं टैरिफ पिटीशन पर उत्तराखण्ड विद्युत नियामक आयोग द्वारा पारित टैरिफ आदेश दिनांक 28-03-2024 के विरुद्ध यूपीसीएल द्वारा आयोग के समक्ष प्रस्तुत की गयी पुर्नविचार याचिका की स्वीकार्यता पर निर्णय लेने हेतु जन सुनवाई के सम्बन्ध में।
Application seeking review of the tariff order issued by Hon’ble commission on 28-03-2024 on the Annual Revenue Requirement and Tariff Petition of UPCL for FY 2024-25.
Public Notice (English) Inviting Comments on UPCL’s proposal for determination of Additional Surcharge in accordance with the provisions of UERC (Terms and Conditions of intra-State Open Access) Regulations, 2015 to meet the fixed cost of UPCL arising out of its obligation to supply electricity to the Open Access Consumers for the period 1st October, 2024 to 31st March, 2025.
राज्य में उन्मुक्त अभिगमन बिजली उपभोक्ताओं को विद्युत आपूर्ति करने की अनिवार्यता के कारण यूपीसीएल द्वारा वहन की जाने वाली स्थायी लागत की वसूली के लिये यूपीसीएल द्वारा उत्तराखण्ड विद्युत नियामक आयोग (राज्यान्तर्गत उन्मुक्त अभिगमन के निबंधन एवं शर्तें) विनियम, 2015 के प्रावधानों के अन्तर्गत अक्टूबर, 2024 से मार्च, 2025 तक की अवधि में अतिक्ति सरचार्ज निर्धारण के लिये दायर की गयी याचिका पर विचार आंमन्त्रित किये जाने के सम्बन्ध में सार्वजनिक सूचना (हिन्दी)।
Petition regarding Determination of Additional Surcharge in Accordance with the Provisions of UERC (Terms and conditions of Intra – State Open Access) Regulations, 2015 to meet the fixed cost of UPCL arising out of its obligation to Supply Electricity to Open Access Consumers.
Rate Schedule of Fuel and Power Purchase Cost Adjustment for the period from 01-07-2024 to 31-07-2024.
Regarding revision of rate schedule as annexed with circular no. 2781 dated 05-06-2024 regarding rate schedule of Fuel and Power Purchase cost Adjustment (FPPCCA).
Regarding rate schedule of Fuel & Power Purchase Cost Adjustment (FPPCA) for the period 01-05-2024 to 31-05-2024.
Public Notice regarding implementation of Tariff Order for the FY 2024-25 (including Format of option for continuous supply for FY 2024-25, application form for Green Power).
Order on True up for FY 2022-23 Annual Performance Review for FY 2023-24 & ARR for FY 2024-25.
Regarding revised rate schedules applicable from 01-04-2024.
In conformity with the Order dated 22-03-2024 issued by Hon. UERC vide its letter dated 26-04-2024, as per the provisions of Section-42(4) of the Electricity Act, 2023 read with the provisions of UERC (Terms and conditions of Intra-State Open Access) Regulations, 2015, additional surcharge @ Rs. 1.09/kVAh shall be charged on the energy drawn through Open Access at consumer end for the period from 01-04-2024 to 30-09-2024.
Regarding rate of interest on Security Deposit.
Regarding rate schedule of Fuel & Power Purchase Cost Adjustment (FPPCA) for the period 01-04-2024 to 30-04-2024.
Regarding procedure for recovery of Additional Security Deposits against credit sale of electricity.
Regarding rate schedule of Fuel and Power Purchase Cost Adjustment (FPPCA) for the period 01-03-2024 to 31-03-2024.
Regarding rate schedule of Fuel and Power Purchase Cost Adjustment (FPPCA) for the period 01-02-2024 to 29-02-2024.
Petition on determination of determination of Additional Surcharge in accordance with the provisions of UERC (Terms and Conditions of intra–State Open Access) Regulations, 2015 to meet the fixed cost of UPCL arising out of its obligation to supply electricity to the Open Access Consumers.
Public Notice inviting comments on UPCL’s proposal for determination of Additional Surcharge in accordance with the provisions of UERC (Terms and Conditions of intra–State Open Access) Regulations, 2015 to meet the fixed cost of UPCL arising out of its obligation to supply electricity to the Open Access Consumers for the period 1 April 2024 to 30 September 2024.
सार्वजनिक सूचनाः- राज्य के उन्मुक्त अभिगमन बिजली उपभोक्ताओं को विद्युत आपूर्ति करने की अनिवार्यता के कारण यूपीसीएल द्वारा वहन की जाने वाली स्थायी लागत की वसूली के लिये यूपीसीएल द्वारा उत्तराखण्ड विद्युत नियामक आयोग (राज्यान्तर्गत उन्मुक्त अभिगमन के निबंधन एवं शर्तें) विनियम, 2015 के प्रावधानों के अन्तर्गत अपै्रल, 2024 से सितम्बर, 2024 तक की अवधि में अतिरिक्त सरचार्ज निर्धारण के लिये दायर की गयी याचिका पर विचार आंमत्रित किये जाने के सम्बन्ध में।
Regarding rate schedule of Fuel and Power Purchase Cost Adjustment (FPPCA) for the period 01-01-2024 to 31-01-2024.
Public Notice on Inviting Comments on the Petition for True-up for FY 2022-23 and Annual Performance Review for FY 2023-24 and determination of Tariff for FY 2024-25 filed by UPCL before the Uttarakhand Electricity Regulatory Commission.
सार्वजनिक सूचना :- यूपीसीएल द्वारा उत्तराखण्ड़ विद्युत नियामक आयोग के समक्ष प्रस्तुत की गयी वित्तीय वर्ष 2022-23 की ट्रू-अप, वित्तीय वर्ष 2023-24 की कार्य प्रगति समीक्षा तथा वित्तीय वर्ष 2024-25 की वार्षिक राजस्व आवश्यकता एवं टैरिफ पिटीशन पर विचार आंमत्रित किये जाते है।
Petition for Determination of Annual Revenue Requirement (ARR) and Tariff for FY 2024-25 along with True-up for FY 2022-23 and Annual Performance Review for FY 2023-24.
Public Notice regarding Fuel and Power Purchase Cost Adjustment (December 2023).
Regarding rate schedule of Fuel and Power Purchase Cost Adjustment (FPPCA) for the period 01-12-2023 to 31-12-2023.
Public Notice regarding Fuel and Power Purchase Cost Adjustment.
Regarding FPPCA for the period from 01-11-2023 to 30-11-2023.
Rate Schedule of FPPCA for the period from 01-10-2023 to 31-10-2023.
Public Notice regarding revision of Jurisdictional are of CGRFs.
Regarding pursuant to the approval granted by Hon’ble UERC for Revision the operational are of CGRFs of UPCL.
Regarding additional surcharge (01-10-2023 to 31-03-2024)
Regarding pursuant to order issued by Hon’ble UERC, the operation of CGRF Pithoragarh has been suspended by UPCL wef 11-08-2023 till further orders and jurisdiction area of CGRF, Pithoragharh is now with CGRF, Almora..
माननीय उत्तराखण्ड विद्युत नियामक आयोग के आदेशों के अनुरूप यूपीसीएल द्वारा उपभोक्ता शिकायत निवारण मंच, पिथौरागढ का संचालन 11.08.2023 से अग्रिम आदेशों तक निलम्बित किये जाने तथा उपभोक्ता शिकायत निवारण मंच, पिथौरागढ़ का क्षेत्राधिकार अब उपभोक्ता शिकायत निवारण मंच, अल्मोडा को प्रदान किये जाने के सम्बन्ध में।
Regarding FCA (01-07-2023 to 30-09-2023).
Public notice regarding determination of Additional Surcharge in Accordance with the Provisions of UERC (Terms and Conditions of Intra – State Open Access) Regulations, 2015 to meet the fixed cost of UPCL arising out of its obligation to Supply Electricity to the Open Access Consumers. – English.
सार्वजनिक सूचना – राज्य के उन्मुक्त अभिगमन बिजली उपभोक्ताओं को विद्युत आपूर्ति करने की अनिवार्यता के कारण यूपीसीएल द्वारा वहन की जाने वाली स्थायी लागत की वसूली के लिये यूपीसीएल द्वारा उत्तराखण्ड विद्युत नियामक आयोग (राज्यान्तर्गत उन्मुक्त अभिगमन के निबंधन एवं शर्तें) विनियम, 2015 के प्रावधानों के अन्तर्गत अक्टूबर, 2023 से मार्च, 2024 तक की अवधि में अतिरिक्त सरचार्ज निर्धारण के लिये दायर की गयी याचिका पर विचार आंमत्रित किये जाने के सम्बन्ध में।
Petition on determination of Additional Surcharge in Accordance with the Provisions of UERC (Terms and Conditions of Intra – State Open Access) Regulations, 2015 to meet the fixed cost of UPCL arising out of its obligation to Supply Electricity to the Open Access Consumers. – English.
Public Notice regarding implementation of Tariff Order for the FY 2023-24.
Prescribed Format of Option for Continuous Supply for the FY 2023-24.
Application Form for Supply of 100% Green Power.
Tariff Order of UPCL for FY 2023-24.
Regarding revised rate schedules which were applicable form 01-04-2023.
Public Notice and Petition on determination Additional Surcharge in accordance with the provisions of UERC (Terms and Conditions of intra-State Open Access) Regulations, 2015 to meet the fixed cost of UPCL arising out of its obligation to supply electricity to the Open Access Consumers for the period 1stApril 2023 to 30th September 2023.
Public Notice regarding inviting Comments on the Petition for True-up for FY 2021-22 and Annual Performance Review for FY 2022-23and determination of Tariff for FY 2023-24 filed by UPCL before the Uttarakhand Electricity Regulatory Commission.
सार्वजनिक सूचना यूपीसीएल द्वारा उत्तराखण्ड़ विद्युत नियामक आयोग के समक्ष प्रस्तुत की गयी वित्तीय वर्ष 2021-22 की ट्रू-अपए वित्तीय वर्ष 2022-23 की कार्य प्रगति समीक्षा तथा वित्तीय वर्ष 2023-24 की वार्षिक राजस्व आवश्यकता एवं टैरिफ पिटीशन पर विचार आंमत्रित किये जाने के सम्बन्ध में।
Petition for Determination of Annual Revenue Requirement (ARR) and Tariff Determination for FY 2023-24 along with True-up for FY 2021-22 and Annual Performance Review for FY 2022-23 dated 26-12-2022 dated 15-12-2022.
Petition for Determination of Annual Revenue Requirement (ARR) and Tariff Determination for FY 2023-24 along with True-up for FY 2021-22 and Annual Performance Review for FY 2022-23. (Deficiency Reply) dated 26-12-2022.
Pubic notice and Order regarding Implementation of Tariff as approved by UERC vide its order dated 19-10-2022 in the matter of petition seeking approval for increasing the Continuous Supply Surcharge in the Tariff Order for FY 2022-23.
The Rate Schedule of FCA applicable for the period from 01-10-2022 to 31-12-2022.
Public Notice:- Regarding implementation of Tariff as approved by UERC vide its order dated 28-09-2022 in the matter of petition seeking approval for recovery of incremental power purchase cost.
Public Notice:- Regarding application seeking approval for increasing the continuous supply surcharge as approved by the Hon’ble Commission in the Tariff Order for FY 2022-23.
Order:- Regarding implementation of Tariff as approved by UERC vide its order dated 28-09-2022 in the matter of petition seeking approval for recovery of incremental power purchase cost.
Petition:- Regarding application seeking approval for increasing the continuous supply surcharge as approved by the Hon’ble Commission in the Tariff Order for FY 2022-23.
Hon. UERC order regarding approval of the Commission on Deviation in Power Purchase Costs and Removal of Difficulty for allowing Recovery of Incremental Power Purchase Cost and compliance thereof to directives issued under Multi Year Tariff Order dated 31-03-2022.
Hon. UERC order regarding revision in miscellaneous charges.
Public Notice (English) Regarding Public Hearing on the Petition filed by Uttarakhand Power Corporation Limited for seeking approval of the Commission on the Deviation in Power Purchase Costs and Removal of Difficulty for allowing Recovery of Incremental Power Purchase Cost and compliance thereof to directives issued under Multi Year Tariff Order.
सार्वजनिक सूचनाः- विद्युत क्रय लागत में विचलन एवं विद्युत क्रय लागत में हुई वृद्धि की वसूली हेतु कठिनाई को दूर करने हेतु माननीय आयोग का अनुमोदन प्राप्त करने एवं बहुवर्शीय टैरिफ आदेष के अन्तर्गत जारी निर्देषों के अनुपालन हेतु यूपीसीएल द्वारा माननीय आयोग के समक्ष प्रस्तुत की गयी याचिका पर जन सुनवाई
Petition regarding seeking approval of Hon’ble UERC on Deviations in Power Purchase Costs and Removal of Difficulty for allowing Recovery of Incremental Power Purchase Cost.
Additional Submission in the petition filed vide UPCL letter no. 222/UPCL/RM/B-25 dated 20-07-2022 (Petition regarding seeking approval of Hon’ble UERC on Deviations in Power Purchase Costs and Removal of Difficulty for allowing Recovery of Incremental Power Purchase Cost).
Regarding Rate Schedule of Fuel Charge Adjustment (FCA) (01-07-2022 to 30-09-2022).
Public Notice (English) Regarding revision in Miscellaneous Charges as approved vide UERC’s Tariff Order dated 31-03-2022 for FY 2022-23.
Public Notice (Hindi) Regarding revision in Miscellaneous Charges as approved vide UERC’s Tariff Order dated 31-03-2022 for FY 2022-23.
Petition Regarding revision in Miscellaneous Charges as approved vide UERC’s Tariff Order dated 31-03-2022 for FY 2022-23.
Application seeking Removal of Difficulty in implementation of modified Time of Day Metering as provide in clause 6.13.5 of the Tariff Order dated 31.03.2020 for FY 2022-23 (Request to reconsider the impact of implementing the said Order).(Extension of date of Hearing).
Public Notice regarding Public Hearing in the matter of Petition filed by UPCL for seeking Removal of Difficulty in Implementation of Modified Time of Day Metering as provided in Clause 6.1.3.5 of the Tariff Order dated 31.03.2022 for FY 2022-23.(Hindi)
Public Notice regarding Public Hearing in the matter of Petition filed by UPCL for seeking Removal of Difficulty in Implementation of Modified Time of Day Metering as provided in Clause 6.1.3.5 of the Tariff Order dated 31.03.2022 for FY 2022-23.
Petition regarding Public Hearing in the matter of Petition filed by UPCL for seeking Removal of Difficulty in Implementation of Modified Time of Day Metering as provided in Clause 6.1.3.5 of the Tariff Order dated 31.03.2022 for FY 2022-23.
Public notice to decide in admissibility of the petition for review of the Commission’s Tariff Order dated 31-03-2022 on the Annual Revenue Requirement & Tariff Petition for FY 2022-23.
Application seeking review of the UERC’s Tariff Order on the Business Plan and Multi Year Tariff Petition for the Control Period from FY 2022-23 to FY 2024-25.
Application form for supply of green power
PRESCRIBED FORMAT OF OPTION FOR CONTINUOUS SUPPLY.
Regarding Interest on security deposit.
OM regarding revised rate schedule
Tariff Order of UPCL for FY 2022-23.
Maximum annual energy consumption allowed and monthly fixed charge for departmental employees.
Public Notice regarding Tariff and charges effective from 01-04-2022
Office Memorandum 1359 dated: 04-04-2022 regarding open Access Surcharge
Petition on determination of Additional Surcharge in Accordance with the with the Provisions of UERC Regulation, 2015 to meet the fixed cost of UPCL arising out of its obligation to Supply Electricity to the Open Access Consumers.
Public Notice inviting Comments on UPCL’s proposal for determination of Additional Surcharge in accordance with the provisions of UERC (Terms and Conditions of intra–State Open Access) Regulations, 2015 to meet the fixed cost of UPCL arising out of its obligation to supply electricity to the Open Access Consumers for the period April, 2022 to September , 2022
सार्वजनिक सूचनाः राज्य के उन्मुक्त अभिगमन बिजली उपभोक्ताओं को विद्युत आपूर्ति करने की अनिवार्यता के कारण यूपीसीएल द्वारा वहन की जाने वाली स्थायी लागत की वसूली के लिये यूपीसीएल द्वारा उत्तराखण्ड विद्युत नियामक आयोग (राज्यान्तर्गत उन्मुक्त अभिगमन के निबंधन एवं षर्तें) विनियम, 2015 के प्रावधानों के अन्तर्गत अपै्रल, 2022 से सितम्बर, 2022 तक की अवधि में अतिरिक्त सरचार्ज निर्धारण के लिये दायर की गयी याचिका पर विचार आंमत्रित किये जाते है ।
Business Plan Petition
Multi Year Tariff Petion for the control period FY 2022-23 to FY 2024-25
Public Notice Inviting Comments on the Petition filed by UPCL for approval of Business Plan for the Control Period FY 2022-23 to FY 2024-25 before the Uttarakhand Electricity Regulatory Commission.
सार्वजनिक सूचना – यूपीसीएल द्वारा उत्तराखण्ड़ विद्युत नियामक आयोग (आयोग) के समक्ष अनुमोदन हेतु प्रस्तुत की गयी नियन्त्रण अवधि वित्तीय वर्ष 2022-23 से 2024-25 की बिजनेस प्लान याचिका पर विचार आंमत्रित किये जाते है।
PUBLIC NOTICE Inviting Comments on the Petition for MYT for the Control Period from FY 2022-23 to FY 2024-25, True-up for FY 2020-21 and Annual Performance Review for FY 2021-22and determination of Tariff for FY 2022-23 filed by UPCL before the Uttarakhand Electricity Regulatory Commission
सार्वजनिक सूचना – यूपीसीएल द्वारा उत्तराखण्ड़ विद्युत नियामक आयोग के समक्ष प्रस्तुत की गयी नियन्त्रण अवधि वित्तीय वर्ष 2022-23 से 2024-25 की राजस्व आवश्यकता पिटीशन, वित्तीय वर्ष 2020-21 की ट्रू-अप पिटीशन, वित्तीय वर्ष 2021-22 की कार्य प्रगति समीक्षा तथा वित्तीय वर्ष 2022-23 की टैरिफ निर्धारण पिटीशन पर विचार आंमत्रित किये जाते है।
Regarding Rate Schedule of Fuel Charge Adjustment (FCA) for the period of 01-10-2021 to 31-12-2021
Regarding additional surcharge @ Rs. 1.94/ kVAh on the energy drawn through Open Access at consumer end for the period from 01-10-2021 to 31-03-2022
Public Notice regarding implementation of Tariff Order for the FY 2021-22
Tariff Orders for FY 2021-22
सार्वजनिक सूचनाः- यूपीसीएल द्वारा मा0 उत्तराखण्ड विद्युत नियामक आयोग के समक्ष प्रस्तुत की गयी वित्तीय वर्ष 2019.20 की True-up petition, वित्तीय वर्ष 2020.21 की कार्य प्रगति समीक्षा तथा वित्तीय वर्ष 2021-22 की वार्षिक राजस्व आवश्यकता एवं टैरिफ पिटीशन पर विचार आंमत्रित किये जाने के सम्बन्ध में।
Public Notice regarding inviting comments on the petitions for True-up of FY 2019-20, Annual Performance Review of FY 2020-21 and determination of Annual Revenue Requirement for FY 2021-22 filed by UPCL before Hon. UERC
Annual Revenue Requirement (ARR) Petition for the financial year 2021-22 along with tariff determination for FY 2021-22, True-Up for FY 2019-20 and Annual Performance Review for FY 2020-21
Public Notice Regarding Inviting Comments on UPCL’s proposal for determination of Additional Surcharge in accordance with the provisions of UERC (Terms and Conditions of intra–State Open Access) Regulations, 2015 to meet the fixed cost of UPCL arising out of its obligation to supply electricity to the Open Access Consumers for the period April 2021 to September 2021
Regarding application for determination of Additional Surcharge in accordance with the provisions of UERC (Terms and Conditions of intra–State Open Access) Regulations, 2015 to meet the fixed cost of UPCL arising out of its obligation to supply electricity to the Open Access Consumers.
OM regarding additional surcharge to be charged on the energy drawn through Open Access at consumer end for the period from 01-10-2020 to 31-03-2021.
Public Notice regarding application seeking review of the tariff order issued by Hon’ble Commission on 18-04-2020 on the Annual Revenue Requirement and Tariff Petition of UPCL for FY 2020-21 (Hindi)
Public Notice regarding application seeking review of the tariff order issued by Hon’ble Commission on 18-04-2020 on the Annual Revenue Requirement and Tariff Petition of UPCL for FY 2020-21 (English)
Regarding application seeking review of the tariff order issued by Hon’ble Commission on 18-04-2020 on the Annual Revenue Requirement and Tariff Petition of UPCL for FY 2020-21
Regarding application seeking approval on the draft plan to pass on the benefit in electricity tariff to the end consumers of the State.
Regarding Inviting Comments by Hon. UERC on the draft policy for “Capitalization Process and Repair & Maintenance” and policy on “Provisioning and Writing Off of Bad and Doubtful Debts” of Uttarakhand Power Corporation Limited. (Policy for Capitalization Process and Repair & Maintenance)
Regarding Inviting Comments by Hon. UERC on the draft policy for “Capitalization Process and Repair & Maintenance” and policy on “Provisioning and Writing Off of Bad and Doubtful Debts” of Uttarakhand Power Corporation Limited. (Policy on Provisioning and Writing Off of Bad and Doubtful Debts)
राज्य के उन्मुक्त अभिगमन बिजली उपभोक्ताओं को विद्युत आपूर्ति करने की अनिवार्यता के कारण यूपीसीएल द्वारा वहन की जाने वाली स्थायी लागत की वसूली के लिये यूपीसीएल द्वारा उत्तराखण्ड विद्युत नियामक आयोग (राज्यान्तर्गत उन्मुक्त अभिगमन के निबंधन एवं षर्तें) विनियम, 2015 के प्रावधानों के अन्तर्गत अक्टूबर, 2020 से मार्च, 2021 तक की अवधि में अतिरिक्त सरचार्ज निर्धारण के लिये दायर की गयी याचिका पर विचार आंमत्रित किये जाते है के सम्बन्ध में सार्वजनिक सूचना।
Public Notice regarding Inviting Comments on UPCL’s proposal for determination of Additional Surcharge in accordance with the provisions of UERC (Terms and Conditions of intra–State Open Access) Regulations, 2015 to meet the fixed cost of UPCL arising out of its obligation to supply electricity to the Open Access Consumers for the period October 2020 to March 2021
Regarding Petition on determination of Additional Surcharge in Accordance with the the provisions of UERC (Terms and conditions of Intra – State Open Access) Regulations, 2015 to meet the fixed cost of UPCL arising out of its obligation to Supply Electricity to the open access consumers
Relief in electricity tariff due to Covid-19
मा0 उत्तराखण्ड विद्युत नियामक आयोग द्वारा वित्तीय वर्ष 2020-21 हेतु अनुमोदित टैरिफ ऑर्डर दिनांक 18.04.2020 के अनुसार प्रीपेड मीटरिंग प्रणाली के संदर्भ में आदेश निर्गत किये जाने के सम्बन्ध में।
OM regarding implementation of Tariff order wef 1.4.2020
Public Notice regarding the tariff and charges for different categories of consumers approved by UERC and effective from 01-04-2020
Regarding application seeking continuous supply in accordance with the provisions of Retail Tariff order dated 18-04-2020 issued by UERC
Salient features of Tariff Orders for FY 2020-21 (English)
Salient features of Tariff Orders for FY 2020-21 Hindi
True up for FY 2018-19 Annual Performance Review FY2019-20 & ARR for FY 2020-21 UPCL (Tariff Order for FY 2020-21)
Public Notice regarding inviting comments on UPCL’s proposal for determination of Additional Surcharge in accordance with the provisions of UERC (Terms and Conditions of intra-state open access) Regulations, 2015 to meet the fixed cost of UPCL arising out of its obligation to supply electricity to the Open Access Consumers for the period April 2020 to September 2020.
Regarding Petition for determination of Additional Surcharge in accordance with the provisions of UERC (Terms and Conditions of Intra – State Open Access) Regulations, 2015 to meet the fixed cost of UPCL arising out of its obligation to supply electricity to the open access consumers.
Rate schedule of Fuel Charge Adjustment (FCA) from 01-01-2020 to 31-03-2020
Deficiency note reply dated 17-12-2019
ARR & Tariff petition for FY 2020-21
Public Notice on petition for True-up of FY 2018-19, Annual Performance Review of FY 2019-20 and determination of ARR for FY 2020-21
Rate schedule of Fuel Charge Adjustment (FCA) from 01-10-2019 to 31-12-2019
OM No. 3479 dated 31-10-2019 regarding imposition of Additional Energy Charge from 01-10-2019 to 31-3-2020.
UERC Order dated 25-10-2019 regarding review of the Commission’s Order dated 27.02.2019 on True up for FY 2017-18, Annual Performance Review for FY 2018-19 and Annual Revenue Requirement for FY 2019- 20.
UERC Order dated 25-10-2019 regarding recovery of power purchase cost incurred in excess of the approved power purchase cost for FY 2018-19.
Public Notice for recovery of Additional Energy Charges
Public Notices on seeking approval for recovery of power purchase cost incurred in excess of the approved power purchase cost for FY 2018-19
Regarding additional surcharge on the energy drawn through open access (1-10-2019 to 31-03-20)
Application seeking review of the Tariff Order issued by Hon’ble Commission on 27-02-2019 on the Business Plan and Multi-year Tariff petition for the control period FY 2019-20 to FY 2021-22
Rate schedule of Fuel Charge Adjustment (FCA) from 01-04-2019 to 30-06-2019
Public Note Regarding Petition on Determination of Additional Surcharge in Accordance with the Provisions of UERC Regulation, 2015 to meet the Fixed Cost of UPCL arising out of his obligation to Supply Electricity to the Open Access Consumers.
Petition on Determination of Additional Surcharge in Accordance with the Provisions of UERC Regulation, 2015 to meet the Fixed Cost of UPCL arising out of his obligation to Supply Electricity to the Open Access Consumers.
Retail Electricity Tariff Applicable with effective from 01-04-2019
Approval of Business Plan and Multi Year Tariff Petition for UPCL or Third Control Period (FY 2019-20 to FY 2021-22) dated 27 Feb 2019
Prescribed Format of Option for Continuous Supply for the FY 2019-20
Public Notice Regarding implementation of Tariff Order for the FY 2019-20
Rate schedule of Fuel Charge Adjustment (FCA) from 01-01-2019 to 31-03-2019
Public Notice: Business Plan
Public Notice : MYT Petition
Multiyear Tariff petition for the control period from FY 2019-20 to 2021-22
Business Plan Petition for the Control period from FY 2019-20 to 2021-22
Reply of deficiency notes dated 06-12-2018 on Business Plan & MYT Petition
Regarding Green Energy Cess applicalbe on Commercial and Industrial consumers
Electricity Duty applicable w.e.f. 01-01-2016
Office Memorandum regarding rate of interest on the security deposits of consumers
Rate schedule of Fuel Charge Adjustment (FCA) from 01-10-2017 to 31-12-2017
OM No. 268 dated 22-01-2018 Regarding regarding Fuel Charge Adjustment (FCA) applicable from 01-01-2018 to 31-03-2018
Retails Electricity Tariff applicable w.e.f. 01-04-2018
OM regarding corrigendum in Tariff order for FY 2018-19
Tariff order of UPCL for FY 2018-19
Public Notice regarding implementation of Tariff Order for the FY 2018-19
Prescribed Format of Option for Continuous Supply for the FY 2018-19
Regarding deduction of Income Tax at source from interest on security deposits
Review Petition against Tariff Order dated 21-03-2018 – Petition
Review Petition against Tariff Order dated 21-03-2018 – Public Notice (Hindi)
Tariff Order dated 21-03-2018 – Public Notice (English)